Solar & Battery · Gillingham

Solar panel installers in Gillingham. Designed around your roof.

Free, custom solar panel and battery installation designed for your Gillingham address — usually back within 24 hours. We're MCS-accredited, handle all the paperwork, and put a company owner on every install across Kent.

  • MCS accredited
  • 0% VAT on solar & battery
  • 24-hour quote
  • Owner-led installs

Get your free quote

Step 1 of 3 · 60 seconds

5.0 on Google

No obligation · 0% VAT on solar & battery until March 2027

Mobile or landline — so we can call you to book your free survey.

No pushy sales, no spam — just your free custom design. An owner is on every install.

Local installer

Solar panel installation in Gillingham

Gillingham and Rainham's Victorian terraces and post-war semis make up some of Medway's best solar streets — we've designed a real 17-panel, 8 kW system with 23 kWh of storage here. Across ME7–ME8 we run survey, MCS install, DNO application and certification as one team.

We work right across Gillingham — from The Great Lines Heritage Park, Gillingham Park and the Strand to the surrounding Kent neighbourhoods.

Postcodes covered: ME7–ME8 · Kent

Local knowledge

What we see on Gillingham roofs.

Roofs & housing in Gillingham

Gillingham's housing grew around the naval dockyard, so long runs of Victorian and Edwardian terraces dominate the older streets - typically slate, at steeper pitches, and often in unbroken terraces where scaffolding access is planned street by street. The inter-war and post-war semis further out carry concrete tile on more conventional pitches. Medway's south-facing slopes give some of the best aspect in our patch.

Planning & permissions

Most Gillingham installs proceed under permitted development. Medway Council maintains conservation areas around the historic dockyard and parts of the older town, so a street-facing array there needs confirming first. Terraced access is the practical constraint more often than planning.

Real pricing, custom design

Every Gillingham design is built around your actual roof and usage — not a package price off a website. We design from aerial imagery before anyone visits, then confirm on site, across ME7–ME8 and neighbouring Rainham, Chatham, Hempstead. Your free design is usually back within 24 hours with the full price in writing.

See what a system costs →

Package prices are based on one roof elevation with a single scaffold lift. Extra roof faces or additional scaffolding are quoted at survey.

Straight answers

Solar panel installers in Gillingham — the questions we get asked

Who installs solar panels in Gillingham?

ECONEXIS is an MCS-accredited solar panel, battery storage and heat pump installer covering Gillingham and the ME7–ME8 postcodes, based in Chadwell Heath, Essex. The company is TrustMark, NAPIT and RECC registered, a company owner attends every installation, and the full job — design, install, DNO grid application and certification — is handled in-house.

How much does solar panel installation cost in Gillingham?

Recent real ECONEXIS installs start from £4,990 for a solar-only system, or £6,890 for a 10-panel system with a 5.6 kWh battery — up to around £14,000 for a 20-panel system with a large battery. As a guide to sizing: Gillingham's housing grew around the naval dockyard, so long runs of Victorian and Edwardian terraces dominate the older streets - typically slate, at steeper pitches, and often in unbroken terraces where scaffolding access is planned street by street, which shapes how many panels fit. Your fixed Gillingham quote is confirmed after a free custom design — usually within 24 hours.

Do you actually cover Gillingham and the ME7–ME8 postcodes?

Yes — Gillingham is part of our core install area. We cover ME7–ME8 and the surrounding Kent neighbourhoods, with a company owner on every install. We're also regularly in Rainham and Chatham, so you'll rarely wait long for a survey slot.

Why ECONEXIS

Why Gillingham homeowners choose ECONEXIS.

No subcontractors

The people who design your system are the people who fit it. A company owner is on site for your whole installation — start to finish, not a subcontracted crew you have never met.

We handle everything

MCS, the DNO application, certificates and all the paperwork — managed by us, so you don't lift a finger.

Insurance-backed guarantee

Premium tier-1 panels with a 25-year warranty, protected by an insurance-backed guarantee with the IWA (Independent Warranty Association).

Real numbers

Real systems, real prices — and yours.

Three designs we quoted this year, exactly as priced — installed, certified, 0% VAT. Then estimate your own in ten seconds.

The value start

10 panels · 4.7 kW · 10 kWh Fox ESS battery

£7,990

≈ £1,250 / year · ≈ 6½ year payback

The big saver

17 panels · 8 kW · 23 kWh Fox ESS battery

£11,837

≈ £2,000 / year · ≈ 6 year payback

What would yours look like?

Slide to your rough monthly electricity bill.

£150 / month
A system like 12–14 panels + 11.5 kWh battery
Price guide £8,300 – £10,400
Est. saving £1,350 – £1,700 / year
Payback ≈ 6 years
Get my exact design — free

Estimates based on our real 2026 quotes and typical South East generation. Prices assume one roof elevation with a single scaffold lift; extra roof faces or scaffolding are quoted at survey. Your exact figure comes from a free custom design for your roof — usually within 24 hours.

How it works

From first click to fitted — in three steps.

1

Tell us about your home

A 60-second form — or a quick 15-minute call if you'd rather talk.

2

Free, no-obligation survey

We confirm your roof, your exact numbers and the right design for your home.

3

Approve & install

An owner on site, fully certified, fitted in as little as two weeks.

Solar in Gillingham — your questions

Who installs solar panels in Gillingham?

ECONEXIS is an MCS-accredited solar panel, battery storage and heat pump installer covering Gillingham and the ME7–ME8 postcodes, based in Chadwell Heath, Essex. The company is TrustMark, NAPIT and RECC registered, a company owner attends every installation, and the full job — design, install, DNO grid application and certification — is handled in-house.

How much does solar panel installation cost in Gillingham?

Recent real ECONEXIS installs start from £4,990 for a solar-only system, or £6,890 for a 10-panel system with a 5.6 kWh battery — up to around £14,000 for a 20-panel system with a large battery. As a guide to sizing: Gillingham's housing grew around the naval dockyard, so long runs of Victorian and Edwardian terraces dominate the older streets - typically slate, at steeper pitches, and often in unbroken terraces where scaffolding access is planned street by street, which shapes how many panels fit. Your fixed Gillingham quote is confirmed after a free custom design — usually within 24 hours.

Do you actually cover Gillingham and the ME7–ME8 postcodes?

Yes — Gillingham is part of our core install area. We cover ME7–ME8 and the surrounding Kent neighbourhoods, with a company owner on every install. We're also regularly in Rainham and Chatham, so you'll rarely wait long for a survey slot.

How quickly can you install in Gillingham?

Your free custom design usually comes back within 24 hours. After your survey and go-ahead, most Gillingham installations are booked within a few weeks and completed in one to two days on site.

Do I need planning permission for solar panels in Gillingham?

In short: Most Gillingham installs proceed under permitted development. Medway Council maintains conservation areas around the historic dockyard and parts of the older town, so a street-facing array there needs confirming first. Terraced access is the practical constraint more often than planning. We check the rules for your exact address during the free design and handle any paperwork needed — you won't have to deal with the council yourself.

Who handles the DNO application for my Gillingham install?

We do, completely. We prepare and submit the DNO application for your Gillingham property, manage any conditions, and register the system for MCS certification — you don't fill in a single form.

What savings can a Gillingham homeowner expect?

Across our recent quotes, estimated first-year savings ranged from £1,100 to £2,100 with typical payback of 5–8 years, depending on system size and how you use your electricity. Your free design includes savings figures specific to your home in Gillingham — never a generic promise.

Nearby areas

Solar panel installers near Gillingham

Searching for a solar panel installer near you? We are based in Chadwell Heath, RM6 6AX, which puts Gillingham within our normal working area rather than a special trip.

Around Gillingham we regularly install in Rainham, Chatham, Hempstead, Wigmore and Twydall — plus the surrounding Kent towns.

Get started

Ready for solar in Gillingham?

A free, no-obligation quote for your address — and a free survey when you're ready.

0% VAT until March 2027